Features
NO SHUTTERING AT FORMWORK STAGE
WATER DRAINAGE FEATURES AVAILABLE
IMPROVED BALUSTRADE LEAD TIME
NO REQUIREMENT FOR REBAR SCANNER SURVEY
FLEXI INSTALLATION GA PROVIDED
NO REQUIREMENT FOR COSHH REPORTS (NO CHEMICAL ANCHORS)
NO AIRBORNE DUST PARTICLES FROM SITE DRILLING
NO LEADING EDGE DRILLING
POSITIVE INTERFACE BETWEEN PERMANENT FORMWORK FACE AND BALUSTRADE
PRE-INSTALLED BALUSTRADE ANCHORS